A £4.4 million refurbishment for Manchester city council. Within this project we had the huge task of revamping an old and tired looking leisure centre and olympic sized swimming pool with public viewing area with walls spanning up to 10 metres in height.

The pool walls where also lined in a Hera design acoustic panel to reduce sound reverberation in such a large open space.

Metal stud partitions were used throughout the leisure centre using a variety of systems.

Both 2 coat wet plaster was used on existing walls along with taping and skimming. The whole leisure centre was re-fitted with a full grid and tile ceiling to all new studios and communal areas.